The views included hourly production figures. The refresh interval was approximately one to two hours, not continuous real-time detection.

A clearer view during the shift.

  • Production in context

    Processed, accepted and rejected quantities, yield and shift progress in one view, each workstation flow reported separately.

  • Defect detail within reach

    Teams could look past a summary reject figure to part, workstation, nozzle, ink or material batch, and thermal-test data where recorded.

  • History behind the current result

    Historical reporting gave current figures context instead of leaving each shift as an isolated snapshot.

What Datansh delivered

  • A production-monitoring platform

    Shared floor screens showed hourly and recent production figures alongside accepted output, rejected output and yield.

  • Quality and cost reporting

    Scrap-cost information and defect detail supported examination by plant and quality teams.

  • Automated reporting from existing systems

    Existing manufacturing data fed shift views and historical reports instead of end-of-day review alone.

  • Views for different decisions

    Operators, supervisors and management could use different levels of detail, from shift progress to historical reporting.

The delivered scope was reporting and analytical access, not a deployed predictive-quality model or an automated process-control system.

The context behind a rejected component

  • Production time, workstation and quantity

  • Accepted and rejected units, yield and defect codes

  • Part number and workstation identity

  • Nozzle and material or ink-batch context

  • Curing duration and relevant thermal-test results

  • Operator and shift information where appropriate

Which fields can be compared depends on the records and how they are linked. These fields describe the reporting scope, not proof that every variable caused a defect.

What this case demonstrates

Better access to production and quality information, with more analytical detail during production: that is the result the delivery material establishes.

No measured reduction in scrap, yield improvement, faster corrective response or annual financial savings is claimed. Better access to the figures is not a verified production improvement.

What the reporting could support next

Potential next steps, not delivered scope

  • Deeper defect investigation

    Compare defect patterns across the recorded part, nozzle, batch and process context, with engineering review of the findings.

  • A test of earlier warning

    Assess whether enough linked historical process and quality information exists to test a useful predictive signal.

  • Quality-response workflows

    Where a finding needs action, define ownership, review steps and response tracking before proposing automation.

These are possible extensions. They were not established as delivered outcomes in this case.

The client and proprietary operational identifiers are anonymized. Reported delivery facts, modeled opportunities and future possibilities are separated throughout this case.

Technology used in the reported delivery included Azure, on-premise data services and Microsoft Power BI.

Where would better quality context change a decision?

A shift review, an investigation or a response to a developing issue: start with that decision and the evidence behind it.

Book a Call

Or write to info@datansh.com

Meet us in Austria, November 15 to 20